MEDDICC
100.0
8 of 8 points
All deals/Ironclad Systems
Enterprise · Verbal Commit · close Sep 17 2026
Priya Raman · opp-ironclad
$620,000
MEDDICC
100.0
8 of 8 points
Days since last meaningful call
1 day
call-ironclad-5
External voices
4
Economic buyer on a call: yes
Passed — category stands.
Ironclad Systems stays in Commit. Conversation evidence is fresh, the named economic buyer appears on a call, and the MEDDICC score clears the floor.
Last meaningful external call was 1 day ago. Commit requires a meaningful external call within 14 days. 0 short call(s) were ignored.
Greta Holm is named in CRM and appears on a call as Greta Holm.
Score 100 / 100 from 8 of 8 points. 8 field(s) corroborated on a call (1.0 each), 0 CRM-only (0.5 each), 0 absent (0).
4 distinct external participant(s) (seniority-weighted score 9): Greta Holm, Noah Feldman, Ivy Chen, Marcus Cole.
Call evidence counts 1.0, CRM-only 0.5, absent 0.
100.0 / 100
Win-rate lift of 4 pts on $40M outbound motion
1 pt
Greta Holm, CFO
1 pt
MEDDICC capture, CRM hygiene, SSO/SCIM
1 pt
CFO + CRO; already socialized to the board
1 pt
MSA executed 1 Sep; SOW last page
1 pt
Reps mark Commit with no buyer on a call
1 pt
Noah Feldman, SVP Sales
1 pt
Build-vs-buy against an internal data team
1 pt
Calls under 3 minutes are not meaningful for freshness.
Ironclad CFO/SVP discovery
Jul 28 2026 · 55 min · call-ironclad-1
Meaningful · External: Greta Holm (c-level), Noah Feldman (vp)
Greta wants a 4-point win-rate lift on a $40M outbound motion. Noah described reps marking Commit with no buyer on a call.
RevOps design session
Aug 8 2026 · 45 min · call-ironclad-2
Meaningful · External: Noah Feldman (vp), Ivy Chen (director), Marcus Cole (manager)
Ivy and Marcus walked MEDDICC capture and CRM hygiene. Internal data team is the build-vs-buy alternative.
Board socialization recap
Aug 19 2026 · 31 min · call-ironclad-3
Meaningful · External: Greta Holm (c-level), Noah Feldman (vp)
Greta said the board already saw the number. MSA targeted for 1 Sep.
MSA executed
Sep 1 2026 · 15 min · call-ironclad-4
Meaningful · External: Greta Holm (c-level)
Greta confirmed the MSA executed 1 Sep. SOW is the last page. No new objections.
SOW check-in
Sep 2 2026 · 8 min · call-ironclad-5
Meaningful · External: Noah Feldman (vp)
Noah said legal is on the last SOW page and implementation kickoff is calendared.